PABLO DANIEL BENALCAZAR FLORES

Date of Birth: 25 of April, 1965
Identity Number: 170803219-6
Adress: Las Ilusiones StreetLT 2 and Orquideas,Llano Chico, Quito
– Ecuador
Phone: 593 – 2 – 2830575
Mob: 593 – 998749708 / 593-995602855
Status: Married, three daughters.
e – Mail: Pablo.d.benalcazar@gmail.com
EDUCATIONAL BACKGROUND
|
PRIMARY: Abelardo Moncayo, School, Quito.
HIGH
SCHOOL: Mejia
High School, Quito.
Diploma:
Sciences, Chemistry- Biology
Specialization.
UNIVERSITY:
“Central del Ecuador”
University, Chemical EngineeringSchool.
Diploma:
Chemical Engineer.
SPECIALIZATION:
‘Politecnica Nacional’,
Petroleum Engineering, Master in science.
Diploma:
Exploration, Exploitation
and oil production, MsC.
GEOGRAPHICAL OIL
EXPERIENCE
|
Ecuador
-Escuela Politécnica Nacional
Ecuador
-Sacha, Drago, CCDC
Argentina
-Apetrol, Cabo Virgenes, ERD Well, FV2001.
Ecuador
-Aec, Agip, Vintage, Dygoil, Rio alto, Drillfor, Cpeb,
Drago
Colombia
-Petrominerales, Kappa, Ecopetrol, Mansarovar, Anh, Nexen
Peru,
-Pluspetrol ( Camisea)
Chile
-Enap, Petromagallanes (Patagonia Chilena y Tierra de Fuego)
Mexico
-Pemex (Villa Hermosa)
MUD SYSTEMS EXPERIENCE
|
Water
Base Mud:
Silicate Mud,
Alplex Mud, Maxplex Mud, Potassium Nitrate/Glycol/ PHPA, Potassium
Sulfate/PHPA, Glycol/Amines, PHPA, Qdrill Mud, Inhibidrill Mud, Drill In Mud,
Perflow Mud, Starlose Mud.
Completion
Brines:
NaCl, KCl, CaCl2, Sodium Formiate, Potassium
Formiate.
PROBLEMS ENCOUNTERED
|
Fractures, Lost Circulation, Abnormal pressure,
Swelling Clays, Stuck Pipe, Salt, Anhydrite, H2S, and Kicks.
PROFESIONAL EXPERIENCE
|
At Present:
Auxiliary Profesor at National Politecnic School
Since November 2013 to Present time
CCDC Drilling Fluids
Position: Drilling Fluids Coordinator
POSITION: Operations Coordinator.
DUTIES AND TASKS
Drilling Fluids Engineer –Sacha Field
Preparation
of Drilling Fluids program, Budget and Customer attention.
Oil
Well Production: 3500m.
Since February 2013 to November 2013
Halliburton Baroid Ecuador
Position: Drilling Fluids Engineer
POSITION: Drilling Fluids Engineer.
DUTIES AND TASKS
Drilling Fluids Engineer –Drago Fields
Preparation
of Drilling Fluids and mud Recap.
Shift
28 x 28 days
Oil Well Production:
3500m.
Since April 2012 to December 2012
Qmax Solutions Argentina
Position: Drilling Fluids Engineer
POSITION: Drilling Fluids Engineer.
DUTIES AND TASKS
Drilling Fluids Engineer –Cabo Virgenes Fields
Preparation
of Drilling Fluids and mud Recap.
Shift
28 x 28 days
ERD Gas Well Production: 3500m.
Since June 2010 to April 2012.
Qmax Solutions Colombia, Colombia – SouthAmerica
POSITION: Drilling Fluids
Engineer.
DUTIES AND TASKS
Drilling Fluids Engineer –ANH Tumaco Project, Ecopetrol
– Yaragui-Gavan- Chichimene Fields, ANH Choco Project, Mansarovar- Jazmin,
Girazol, Moriche, Velasquez Fields
*
Preparation of Drilling Fluids and mud Recap..
*
Shift 28 x 28 days
Oil Wells Production: 2500m – 3500m.
Since December 2008 to June 2010
MDF, Mining and Oil Drilling Fluids Company, Punta
Arenas, Chile –South America
POSITION: Drilling Fluids Engineer.
DUTIES AND TASKS
·
Drilling Fluids Engineer of the Gas Wells at ENAP area, Boleadora,Tropilla
Punta Arenas – Chile.
·
Drilling Fluids
Engineer, PETROMAGALLANES Area, Tierra de Fuego, Clarencia Field.
·
Elaboration of Daily, Monthly and Annual Final Reports of production and
·
Shift 30 x 30 days
Oil Wells Production: 2500m
– 3500m.
Since January 2007 to December 2008
Qmax Solutions Colombia, Colombia – South America
Position: Drilling Fluids Engineer
Duties and Task
*
Drilling Fluids Engineer – Petrominerales– Putumayo Field, Mansarovar-
Jazmin, Girazol Fields
*
Preparation of Drilling Fluids and mud Recap..
*
Shift 28 x 28 days
Oil Wells Production: 2500m – 4500m.
Since February 2002 to January 2007
Baker Hughes Drilling Fluids, Ecuador – South America
Position: Drilling Fluids Engineer, Field Operations
Coordinator.
DUTIES AND TASKS
*
Drilling Fluids
Engineer – Petroecuador– Sacha, Atacapi, Parahuaco,Cononaco,Shushufindi, lago
Agrio.
*
Drilling Fluids Engineer – Agip, Villano Field
*
Drilling Fluids Engineer – Perenco, Yuralpa, Oso, Lobo Fields.
*
Drilling Fluids Engineer Petrosud-Petroriva, Pindo, Yuca Fields.
*
Drilling Fluids Engineer - Encana- Tarapoa, Aguas Blancas Fields
*
Elaboration of Drilling Fluids Recaps of the oil wells.
*
Shift 28 x 28 days
Oil Wells Production: 2500m – 3500m.
Since November 1998 to February 2002
QMAX Solutions, Ecuador – South America
POSITION: Drilling Fluids Trainee, Drilling
Fluids Lab Director, Technical operations support.
DUTIES AND TASKS
*
Drilling fluids quality control
*
Drilling fluids Optimization
*
Lab mud products report.
Since June 1997 to September 1998
MI SWACO, Ecuador – South America
POSITION: Solids control and drilling fluids
wastes treatment engineer.
DUTIES AND TASKS
*
Water treatment analysis
*
Solids control management
Since November 1994 to June 1197
Interchem, Ecuador – South America
POSITION: Water Treatment ENGINEER& drilling
fluids wastes management.
DUTIES AND TASKS
Water treatment
analysis, cuttings and solids remediation and recaps
Shift 15 x 15 days
Oil Wells Production:
2500m – 4500m.
COURSES
|
¨
“STOP Safety Course”, YPF Ecuador INC, August 1997
¨
“Business English course”, Accelerated professional program, Quito, may,
2001.
¨
“STOP FOR SUPERVISORS”, Baker Hughes, Quito, March 2003.
¨
‘Negotiation and Conflicts Resolution”, Business School, Quito, November
2003.
¨
“Advantage Reporting for fluids”, Baker Hughes, Houston, May 2003.
¨
“Advantage Engineering for fluids”, Baker hughes, Houston, May 2003
¨
“Continuing improving quality life”, SASAPRO, Quito, July 2003.
¨
“High performance Water base Mud”, Baker Hughes, Houston, may 2004.
¨
“Technology Update Latin America
Region”, Baker Hughes, Houston, October 2004.
¨
English Course, EF International language Schools, July, 2004
¨
“Professional Profile”, Ecuadorian Polithecnic School, July 2006.
¨
“First Aid”, Omega 2000, Quito, April 2007.
SEMINARIES
|
¨
Boiler maintenance, Chemical Engineering Asociation, Quito, July 1992
¨
Total Quality and Productivity, Chemical Engineering Asociation, Quito,
June 1992.
¨
“Water Treatment and Wastes Management”, Quito, March 1998
¨
“Drilling Fluids Evaluation and Lab equipment certification”, QMAX
MEXICO, Reynosa, December 2001.
¨
“Internal Auditoring ISO 9000”, Qmax Ecuador, August, 2002.
¨
“STOP FOR SUPERVISORS”, Baker Hughes, Quito, March 2003.
¨
“Drilling Fluids Formulation and formation damage prevention”, COPYR,
Maracaibo, July 2004.
¨
“High performance Water base Mud”, Baker Hughes, Houston, may 2004.
¨
“Technology Update Latin America Region”, Baker Hughes, Houston, October
2004.
¨
“BHI performance Leadership”, Baker Hughes, Rio de Janeiro, October
2005.
¨
“High Performance Water based Fluids”, Baker Hughes, Houston, march
2006.
¨
“Supervisor Cornestone Program”, Baker Hughes, Quito, January 2007.
¨
“Neuro Linguistic & human engineering”, PNL Learning, Quito, may
2007.
¨
“Well Control” IADC Certified, WCS, IADC Well Cap Supervisor level,
Bogota, July 2010-2012.
¨
“Rig Pass” IADC Certified, WCS, Bogota, July 2010
¨
“Human Behavior and stuck pipe prevention”, Thorneloe Energy, Bogota,
March 2011.
SKILLS AND LANGUAGES
|
*
Programation,
Computation Centre, Central del Ecuador University.
*
English, 10to. Level: Interval – Advanced, EF International Languages
School, Quito
*
Good Knowledge in Windows Microsoft, Internet, Word Processors, Excel
*
Spread Sheets, Acrobat, Presentation Software as Power point
*
Solids Control drilling fluids analysis
*
Mud products quality analysis
*
Drilling fluids designer
*
Completion Fluids designer
TECHNOLOGICAL RESEARCH
|
·
Nitrates Biodegradation by transformation in Nitrogen Gas to drecrease
the driiling fluids wastes electrical conductivity.
·
Amines Inhibition Mechanism study
in prevention bit balling
·
Improving Potassium Sulphate and potassium Nitrate inhibition with Glycol
addition, Ecuador and Peru.
·
PSD calcium Carbonate analysis for Drill In mud to drill Napo and Hollin
Sands in Ecuadorian basin.
·
Lab test and field operations with Silicate mud, Luna Field, Pemex, Mexico.
·
Aluminum Complex wellbore stability analysis and interaction with amines
and organic films. Ecuadorian Clays
analysis by XRD method.
·
Mulfree surfactant as additive of drilling fluids and completion fluids
in preventing the formation damage
·
Mulfree Completion fluids design, field experience at Auca, Shushufindi,
Petroproduccion, Ecuador.
·
Potassium Aluminate, Inhibition and Wellbore Stability Study as a new
drilling fluid System.
OBTAINED ACHIEVEMENTS
|
*
Author’s Award, in recognition of outstanding service, “ the application
of a salt-free high performance water base mud for minimizing Enviromental
impact in the oriente Ecuadorian Basin”, 2005 international Petroleum
Environmental Consortium, Houston, November 2005.
PERSONEL REFERENCES
|
·
Eng. Martin Zaruma, Repsol YPF, PHONE: 0034608300956
·
Eng. Jorge Zuniga, CCDC, Drilling Coordinator, PHONE: 00593-99785142
·
Eng. Jorge Andachi, Weatherford Ecuador,Drilling Coordinator, PHONE,
00593-84381468
No hay comentarios:
Publicar un comentario